Sebuah tempat dimana anda akan belajar geologi, tambang dan tutorial program tambang. Free Tutorial (12) Geologist (7) Miner (5) Software (10) Tutorial (5) Selasa, 10 Maret 2015. Rocscience Slide V6.005 Rocsience Slide adalah salah satu software geoteknik yang mempunyaispesialisasi sebagai software. You just clipped your first slide! Clipping is a handy way to collect important slides you want to go back to later. Now customize the name of a clipboard to store your clips. Rocscience Support. Instant Answers with Online Help Get Help. Maintenance Plan. Get the most out of your tools with our Maintenance Plan.
TRANSCRIPT
RocScience Slope Stability Modeling Software RocSciences Slide is a program that was used to evaluate Odell Dam slope stability conditions.
Slide is a 2D limit equilibrium slope stability program that was used for evaluating the factor of
safety regarding failure by sliding of an embankment or slope for the dam. The program computes
results in terms of factors of safety and slope circle radii and origins, as well as global stability
failure could occur. For this project, the third cross sectional area was chosen out of the seven cross
sections. Cross section three was chosen since it is the best representation of all the cross sections
because of its characteristics.
Figure 5 above is the surveying data retrieved using a total station and the AutoCAD software. For
the RocScience Slide program, the parameters needed were the cohesion of 130 psf, the friction
angle of 25.1 degrees, the unsaturated unit weight is 106 pcf and the saturated unit weight is 120
pcf.
Figure 1: Overview of all AutoCAD generated cross-sections.
Figure 6, shown above, is a visual representation of the computed result from Slide showing
various factors of safety (F.S.) which represent the stability of the soil. The square box above
shows the minimum surface factor of safety when the results are calculated. The computation
method used to determine the slip surfaces is the Bishop Method, which is designed for circular
slip surfaces such as in cross section 3.
The Heel to Toe analysis means that the slopes will be analyzed using the highest elevation on the
right which extends to the lower left elevation on the cross section. The water line is necessary to
determine how the soils will react when pressurized under water load conditions. A F.S. higher
than 1.5 is considered safe as a standard of practice. The F.S. for the minimum slip surface is 3.238.
Figure 2: Results from a Heel to Toe Analysis
The analysis was for Figure 7, shown above, was conducted under the same process as in the Heel to
Toe cross section, the only difference within this analysis is that the cross section was analyzed from
Toe to Heel. In this figure, for a downstream slope failure, the F.S. is 2.382.
[This space was intentionally left blank]
Figure 3: Results from a Toe to Heel Analysis
Hydrologic Analysis A hydrologic analysis is being conducted to determine the adequacy of the spillway located on the
southern side of Odell Dam. Due to the size of the watershed, the Rational Method is insufficient for
determining the amount of water runoff generated, therefore the analysis will be conducted using the
Soil Conservation Service (SCS) methods. This hydrologic analysis will include: a watershed
delineation, rainfall intensities, curve numbers, time of concentrations, reservoir storage, and a
PondPack hydrologic modeling software analysis.
Watershed Delineation The watershed was delineated, by using an ArcGIS topographic map. This map was then imported
into AutoCAD, where lines could be drawn to follow the contours that separate our watershed from
others. The overall area of the watershed was approximated to 19.8 square miles. The watershed
delineation can be found in Appendix G. The use of only one watershed was done to obtain a
conservative estimation of the water runoff generated. The breakdown of the watershed into sub
basins would produce a higher time of concentration, resulting in a lower peak flow. [9]
Figure 4: Odell Dam's Contributing Watershed.
Rainfall Intensities Rainfall Intensities were found using National Oceanic and Atmospheric Administration (NOAA)
Atlas 14. The intensities were established by inputting the exact coordinates of the project site into
the database. Refer to Appendix H for the NOAA Atlas 14 rainfall intensities. [10]
Curve Numbers The curve number considers multiple characteristics of the terrain within a given watershed, such
as the soil group, land use, and treatment of the land. The value assigned to a curve number is
indicative of the runoff coefficients of the land as well as the infiltration rate of the soil. Larger
curve numbers result in more water runoff generated. Pre-burn and 80% post-burn, meaning 80%
of the watershed has been burned, curve numbers were researched for this analysis.
For the pre-burned watershed analysis, Dr. Charles Schlinger provided documentation of the Oak
Creek Flood Warning Study, which provided a full watershed analysis for the watershed
contributing to Oak Creek. The study lists curve numbers for the Oak Creek watershed. Part of this
large watershed was in close proximity to the Odell Lake watershed, therefore the values were used
for this project, as deemed valid by the projects Technical Advisor. The curve number to be used
for the pre-burn scenario is 66. Appendix I shows the images used to obtain this curve number. [11]
Post-burn curve numbers require high precision and complex analysis to obtain, and for this reason
a curve number was researched. The USDA Forest service provides many different curve numbers
for post-burn conditions, ranging in value from 75-91. Due to this project using an 80% post-burn
scenario and a conservative analysis, a curve number of 85 was chosen. [12]
Time of Concentration The SCS Lag Time method was used to determine the time of concentration for both the pre-burn
and 80% post-burn conditions. The Lag Time method requires that the watershed under analysis to
be between 300-2000 acres. [13] The following is the SCS Lag Time equation:
tc = time of concentration (hours)
L = length of longest flow path (feet)
CN = curve number
S = average watershed slope (%)
Table 1 summarizes the values needed to determine the time of concentrations as well as the values
derived.
=1.67 0.8(
1000 10)
0.7
1900 0.5
Table 1: Time of Concentrations.
Reservoir Storage The size and shape of the reservoir is needed to determine the storage capacity as a function of the
water level elevation. ADWR has provided documentation for the storage of Odell Lake. The
storage indication curve has been calculated from the crest of the spillway to the top of the dam,
meaning that the analysis will completed for a full reservoir. [14] During multiple site visits to the
project location it was noted that the reservoir was as full as the crest of the spillway Figure 9 listed
below is the reservoir storage indication curve.
Figure 5: Reservoir Storage Indication Curve.
Bentley PondPack Hydrologic Modeling Software Bentley PondPack has been used to establish the amount of water runoff generated within the
watershed that contributes to the Odell Dam, as well as determining the peak flows through the
spillway for various storm events. Figure 10 shows an image of the model made within PondPack.
The runoff generated within the Watershed travels to Odell Lake, which then routes the water
through the Pond Outlet Exit (POE-1) and finally out of the Spillway and Outlet (O-1). For the
model to run properly, the software needs time depth tables, area of watershed, time of
concentrations, and curve numbers.
NOAA Atlas 14 provided data that was used to make the time depth tables needed within PondPack,
but the model required data that had to be linearly interpolated due to gaps in the data. PondPack
requires time depth tables that have data for a specific increment of time. This analysis used 30
minute intervals for a duration of six hours, whereas NOAA only provided data for 30 minute, 1
hour, 2 hour, 3 hour, and 6 hour duration depths. Six hours is a standard storm duration used by
ADWR when analyzing spillway capacity. Tables J-1 and K-1, found in Appendix J and K, show
the time depth tables generated using the NOAA Atlas 14 and the curves generated within
PondPack.
Figure 6: Bentley PondPack Model
The watershed area, time of concentrations, and curve numbers derived are summarized in the
following table. These numbers along with the storage indication curve are the specific parameters
needed for the PondPack model to run its analysis. Table 2 shows the parameters of the PondPack
software.
Table 3, shown below, lists the peak inflows generated from the watershed, the peak outflows
through the spillway, and whether the spillway is adequate for that specific storm event. Figures
L-1 to L-8 in Appendix L. show the hydrographs generated in PondPack for the runoff generated
from the watershed.
Table 3: PondPack Inflow and Outflow
Table 2: PondPack Parameters.
- *Spillway capacity ~ 4500 cfs. After spillway capacity is reached, PondPack will not give outflow data.
Final Results
RocScience Slide Modeling A geotechnical model of an Odell Dam cross-section was created within Slide to show the F.S. for the
minimum side slope slip surface. The Heel to Toe analysis resulted in a F.S. of 3.238, whereas the Toe
to Heel analysis lead to a F.S. of 2.382. The Toe to Heel analysis shows that the F.S. of 2.382 is the
limiting value, however, it is larger than 1.5 and therefore safe.
Bentley PondPack Modeling A hydrologic model of Odell Lake, Odell Dam, and the surrounding watershed was created to determine
the flows generated during various storm events as well as the watershed during pre-burn and 80%
post-burn conditions.
The pre-burned watershed model resulted in the spillway capacity being reached between the 100-200
year storm events and between the 5-25 year storm events for the 80% post-burn model.
The PondPack model will not give outflow results once the spillway capacity has been reached,
subsequently the software displays warning messages noting that the inflow is greater than the outflow.
Post-burn Discussion Given Northern Arizonas terrain and vegetation, post burn hydrologic studies become necessary when
analyzing larger watersheds.
A post-burned watershed drastically reduces the time of concentration, which in-turn increases the
water runoff generated exponentially. This has the probable effect of creating detrimental damage to
areas located downstream of the dam.
Another adverse effect would be the accumulation of debris from the burned vegetation. The debris
collecting and making its way to the reservoir decreases its storage capacity as well as increasing the
weight of the homogenous water mixture. The added debris will result in higher stresses on the dam as
well as creating blockages in the spillway.
Final Recommendations It is encouraged that Pinewood Country Club, look into previous ADWR recommendations to preform
basic maintenance on the dam. This maintenance includes but is not limited to rodent holes, dense
vegetation, cracks within the training wall and spillway, and debris within outlet of the spillway.
Our analysis also shows that the dams spillway cannot hold the minimum incoming design flood
Ooh, impossible, Yeah, yeah I remember years ago, Someone told me I should take. Caution when it comes to love, I did. I remember years ago, Someone told me I should take Caution when it comes to love, I did. Song Discussions is protected by U.S. Patent 9401941. Other patents pending. Impossible, impossible Impossible, impossible Impossible, impossible Impossible, impossible! Ooh impossible (yeah yeah) I remember years ago Someone told me I should take Caution when it comes to love I did Tell them all I know now Shout it from the roof tops Write it on the sky line All we had is gone now Tell them I was happy And my heart is. Apr 15, 2013 I remember years ago Someone told me I should take Caution when it comes to love I did And you were strong and I was not My illusion, my mistake I was careless, I forgot I did And now when all is.
required by ADWR. Our analysis shows that the spillway will be inadequate between the 100 and 200
year storm event for pre-burn conditions. The team suggest that the spillway should be re-examined, at
the cost of Pinewood Country Club.
These conditions dramatically change once 80% post-burn conditions were examined, to which the
dams spillway indicated inadequate between 5 and 25 year storm event.
Electric Slide Tutorial
TRANSCRIPT
RocScience Solutions for Rocks and Soil Engineering
Create safe, affordable solutions in rock and soil. The programs combine an attractive CAD based graphical interface with a wide range of data interpretation and modeling options you can quickly simulate conditions, predict behavior and establish support requirements for your projects. Rocscience software is extremely user-friendly, but if you need help dont worry Rocscience offers free technical support for all its products, provided by senior engineerdevelopers with experience researching and working in rock and soil. And all Rocscience products are backed by our 30-day money back guarantee.
Dips Tunnels, Slope Stability, Mining, Excavations, Data Analysis, Rock. Examine3D Tunnels, Mining, Excavations, Rock. RocData Slope Stability, Tunnels, Data Analysis, Rock, Mining, Excavations. RocFall Slope Stability, Rockfalls, Rock, Mining. RocPlane Slope Stability, Mining, Rock. RocSupport Tunnels, Rock. Settle3D Settlement, Embankments, Soil. Slide Rock, Soil, Slope Stability, Mining, Excavations, Retaining Walls, Dams, Groundwater, Embankments. Swedge Slope Stability, Mining, Rock.
ONLY those who BUYS the software through us can enjoy the support from our senior geotechnical engineers (Mr. Gouw) on certain questions on the application of the software into practices. They also entitled for reduces fee for the consultation on the review and the application of the softwares into their projects. inquiry: gtloffice@gmail.com